Located in Kashtash Township, Hetian County, Daquke Hydropower Station Project is the fourth step of the "two reservoirs and five levels" hydropower planning and development scheme of Yulong Kashi River in Hetian District, with a total installed capacity of 75 MW. The power station adopts diversion development. The normal water level of the reservoir is 1776.0 meters, 62.6 meters higher than the dam. The total investment is 760 million yuan.
Our company has designed and manufactured two curved working gate QHLY-2x1600K-6.7m hydraulic hoist for the surface hole flood tunnel and one hydraulic hoist QHSY-2000KN-10.2m for the deep hole spillway tunnel.