The Bali Lake Saicheng Lake Control Hub project is located in Yanjiadu, the western suburb of Jiujiang City. It is the combination of Yonganti and Jiujiang City flood prevention dike and Bali Lake dike and Saicheng Lake dike. It is an important control project of Jiujiang City flood control system. The project construction mainly includes the construction of new pumping stations, with a total of 5 installed machines, including 4 Saicheng Lake with designed drainage flow of 91.2m3/s and 1 Bali Lake with designed drainage flow of 22m3/s, with a single capacity of 2000kw and a total installed capacity of 10000kw.Our company has designed and manufactured 10 sets of QPKY-D 2X250KN-4.4m hydraulic hoist for inverted quick gate and 3 sets of QPY-D 2X250KN-11.7m hydraulic hoist for inverted plane gate for this hub. At the same time, the upgrading and transformation of the original 6 sets of QPPYII-500KN-8.6m hydraulic hoist of Saicheng Lake Gate in Balihu New District has been completed.
The Busanga hydropower station is located on the Lualaba River in Katanga Province in the southern region of the Democratic Republic of the Congo (DRC). The Luaraba River is a tributary of the source of the Congo River. The dam site is located about 1.30 kilometers upstream of the Luaraba River gorge outlet. The four steps of the power station are planned for the river section of the Luaraba Gorge. The plant is located approximately 410 km from Lubenbasi, the capital of Katanga Province, and 70 km as the crow flies from Koluvec City, where the R610 road from Koluvec to Busanga passes by the left bank of the dam site. Installed capacity of 240 megawatts, the dam 141.5 meters high, the dam body is arranged with two flood discharge bottom holes, two overflow surface holes. It generates 1.32 billion KWH of electricity annually, accounting for 10% of the DRC's total electricity generation.Our company has designed and manufactured two Qly -2X500KN-4.2m surface hole arc door hydraulic hoist, two QHSY-1000KN-6.4m bottom hole arc door hydraulic hoist for the power station.
Located in Kashtash Township, Hetian County, Daquke Hydropower Station Project is the fourth step of the "two reservoirs and five levels" hydropower planning and development scheme of Yulong Kashi River in Hetian District, with a total installed capacity of 75 MW. The power station adopts diversion development. The normal water level of the reservoir is 1776.0 meters, 62.6 meters higher than the dam. The total investment is 760 million yuan.Our company has designed and manufactured two curved working gate QHLY-2x1600K-6.7m hydraulic hoist for the surface hole flood tunnel and one hydraulic hoist QHSY-2000KN-10.2m for the deep hole spillway tunnel.
The shoreline protection project of Three Rivers entering the Haikou of Jiaozhou Bay is located at the intersection of the seawall and the Haikou of Yuejin River in Jiaozhou City, Qingdao City. It is a water conservancy and water transportation supporting project of the seawall encircling project. The buildings mainly include cofferdam, tide lock, ship lock, highway bridge, hydraulic pump house, management house and connecting structures on both sides, etc.Our company has designed and manufactured two sets of super large hydraulic hoist for the 21m and 17m highway movable Bridges of this project, with specifications of 2X6300kN and 2X5000kN respectively.