Houshan Reservoir is located in the territory of Fan hometown, Suizhong County, and the dam site is located in the middle of the Gouhe River, north of Zhaojiadian, Xuejia Village, Fan Hometown. It is composed of retaining dam section, overflow dam section, diversion dam section, retaining auxiliary dam, diversion tunnel and environment and irrigation water supply pipe. The main dam is 349 meters long, the secondary dam is 80.0 meters long, 51.6 meters higher than the dam, and the diversion tunnel is 6.183 kilometers long. National Type II reservoir is one of 172 major water saving and water supply projects during the 13th Five-Year Plan period.Our company designed and manufactured three sets of Qly -2x1600KN-9M hydraulic hoist for the overflow gauge hole arc working door for the reservoir.
The Longjinxi Water diversion Project in Fujian Province is the second water source project to ensure the safety of Xiamen's water supply and long-term water use. It is also the emergency water supply guarantee project for the 2017 BRICS Xiamen Summit. The project is a large (2) type project, the main structure is composed of Xikou dam, diversion tunnel and inlet and outlet, with a total investment of 370 million yuan. The sluice dam is equipped with 4 holes and the gravity dam section is arranged on both sides. The diversion tunnel is 13.9 kilometers long and the diversion flow is 10 cubic meters per second. It can transport 200 million cubic meters of high-quality water to Xiamen City annually. The project started in August 2011 and was completed in June 2017. In August 2017, water was stored in the sluice. In 2019, he won the Dayu Award of China Water Conservancy Engineering Quality Award.Our company designed and manufactured a set of hydraulic hoist for the drainage tunnel for this project.
Xiashushan Reservoir project is one of 172 major water saving and water supply projects deployed by The State Council during the 13th Five-Year Plan period. The construction tasks are mainly flood control, irrigation and water supply, as well as power generation. The reservoir has a total storage capacity of 196 million m³, which is the largest (2) reservoir, such as Ⅱ, with a controlled drainage area of 422km². Flood control protected 152,000 people and 135,900 mu of arable land. After completion of the project, the downstream flood control standard will be raised from the current situation of less than once every 10 years to once every 20 years; The designed irrigated farmland covers an area of 350,800 mu, providing water source for domestic and industrial water supply of Huining County and 5 towns downstream, with an annual water supply of 112 million m³; The installed capacity of the power station is 15,000 kW, with an annual generating capacity of 35.57 million kW·h. Our company has designed and manufactured three sets of Qly -2x2400KN-8.75M hydraulic hoist for the overflow surface hole arc working door.
The Xinli River sluice project in Panyu District of Guangzhou City is a key project for the comprehensive management of the river system and one of the key auxiliary hydraulic projects for the Guangzhou Asian Games. The project is located in the water network area on the right bank of the Pearl River outlet, 100m in front of the outlet of the Li River and Lianhuashan Channel of the Pearl River, Shilou Town, Panyu District, Guangzhou City. The main tasks of the project are flood control (tide), drainage and improvement of water environment and navigation. The main design contents include: sluice, lock, management building and attached facilities. The new lock is arranged on the left bank of the lock, the longitudinal axis of the lock is parallel to the river, and the management room is arranged on the left bank of the lock room. Navigation standard: lock Class Ⅶ. In 2011, he won the Da Yu Award of China Water Conservancy Engineering Quality Award.Our company has designed and manufactured 2 sets of ship lock cross door hydraulic hoist and 1 set of lift bridge hydraulic hoist for this lock.
Wannian Lock is located 4 kilometers north of Jiantou Ji Town, Taierzhuang District, Zaozhuang City, Shandong Province. The construction of the lock began in April 1996 and was completed and put into operation in December 1999. The gate is the national secondary standard. The effective size (length × width × threshold water depth) of Wannian lock is 230 meters ×23 meters ×5 meters. It can pass through 2,000-ton barges with an annual designed passing capacity of 21 million tons. Wannian lock is the tenth step north of the Yangtze River in the Beijing-Hangzhou Canal and the second lock in the Shandong section.In June 2021, our company won the bid and completed the updating work of four sets of QRWY-230KN/120KN-4.66m miter hydraulic hoist and four sets of 200KN/110KN-4.2m valve hydraulic hoist for Wannian lock lock.
Fenghua Xiangshan Port windshelter anchorage east to Nansha Mountain Island, west to Xuanshan Island, south to Xiangshan Port main channel, the main construction of locks, locks and seawall, of which the total length of sea wall 3515 meters.Our company has designed and manufactured 4 sets of triangular gate hydraulic hoist QRWY-1×1000kN/1× 1000KN-4.9m for the lock.
The Huilan Pangya Hydropower Project is located on the Huilan Pangya River, a tributary of the Sekon River in southern Laos. It is a hydroelectric power station behind a dam, with an installed capacity of 88,000 kW and an annual generating capacity of 480 million KWH. With a high reservoir water level of 820 meters and a larger storage capacity of 141 million cubic meters, it is the largest hydropower station in southern Laos. With a total investment of US $200 million, the project began to generate electricity 66 days in advance. In 2015, the project won the Special Contribution Award of National Electricity of Laos.Our company designed and manufactured two sets of Qly -2X400KN-3.6m spillway arc door hydraulic hoist for the power station.