The Huilan Pangya Hydropower Project is located on the Huilan Pangya River, a tributary of the Sekon River in southern Laos. It is a hydroelectric power station behind a dam, with an installed capacity of 88,000 kW and an annual generating capacity of 480 million KWH. With a high reservoir water level of 820 meters and a larger storage capacity of 141 million cubic meters, it is the largest hydropower station in southern Laos. With a total investment of US $200 million, the project began to generate electricity 66 days in advance. In 2015, the project won the Special Contribution Award of National Electricity of Laos.
Our company designed and manufactured two sets of Qly -2X400KN-3.6m spillway arc door hydraulic hoist for the power station.